01 · The budget

Where the $11.3 million goes

The recommended 2027 operating budget is $86,871,453, up $11,275,287 from the 2026 adopted budget. Here is what that increase is made of, where the revenue comes from, and what has already been cut to get here.

$75.60M
2026 adopted operating budget
$79.48M
2026 actual spending pace, $3.89M (5.1%) over budget
$86.87M
2027 recommended (adjusted 15%). 2028: $94.46M
$0
Reserves or one-time amendments used to balance 2027 or 2028. 2026 used $6.69M.

From 2026 adopted to 2027 recommended

Each bar is one part of the $11.28M increase. Axis starts at $70M.

“All other divisions” is the remainder after the two largest divisions reported in the memo. The $1.2M MIH figure is described as approximate.

Reading the waterfall

Half is Suppression, and most of that half is overtime written down at its real cost

Overtime correction, +$3.17M. The overtime line goes from $3,258,947 to $6,424,722. The memo says the 2026 figure was “knowingly underfunded” during the budget process. The 2027 figure is roughly what 2026 is already costing. This isn’t new activity. It’s the existing cost of keeping 55 seats filled.

Suppression wages and services, +$2.34M. Contract wage and benefit increases on 241 existing suppression positions, NORCOM dispatch and PSERN radio, and $60,000 more for small tools.

MIH moves to Administration, ~$1.2M. Mobile Integrated Health used to be its own division. Since July 2026 it has been delivered under contract by Puget Sound Fire and shows up as a professional-services cost in Administration. That’s a program changing where it’s recorded, not new overhead.

Rest of Administration, +$1.83M. Wages for existing staff, two of the five new positions (Finance Specialist and Public Records Officer), insurance, and cashouts, which are running at $285,003 against a $107,000 budget.

The five new positions total $858,783, or 7.6% of the increase. The recommended budget adds no firefighters, no stations and no response units in 2027.

Already cut

From the full request to the recommendation

Staff’s full request would have funded 19 new positions. Getting to the adjusted 15% removed $2.57M in 2027 and $1.95M in 2028, and deferred 14 of the 19 positions, including every proposed 2027 firefighter.

19 requested positions
Funded in the adjusted 15% (5)Deferred (14)
2027
$89.44M → $86.87M
−$2,568,454
2028
$96.40M → $94.46M
−$1,947,791

This is the third straight budget cycle built with zero-based budgeting, where every line has to be justified from zero instead of rolled forward from last year.

The five positions still in the budget

Cost is the 2027 budget impact. The “if not funded” notes are the memo’s description of the risk carried forward at the 12% base.

Also proposed for 2028

These are separate from the five 2027 positions. The 2028 budget is $94.46M.

Revenue

Who pays for the $86.9M

Revenue equals spending to the dollar, as Board Policy 0002 requires. There is no line for reserves, fund balance or a one-time amendment in 2027 or 2028.

2027 operating revenue

By source

Source2027Character

Why partners feel every change. Partner contributions are what’s left after contract payments and all other revenue are counted. When costs rise or other revenue falls, the partner share absorbs it. When costs are cut, the partners get the savings. How partners and contracts split costs →

Volatile revenue is budgeted low on purpose. GEMT supplemental payments are budgeted at $500,000, while receipts have ranged from $259,900 (2020) to $1,913,640 (2025), and some years had to be partly repaid. Wildland cost recovery is held below its six-year average of $685,987 because reimbursement can take one to three years.

2025 → 2026

What did the extra $6.8M buy?

Spending is rising $6.79M from 2025 actual to the 2026 pace. Overtime barely moved (+$126K), so almost all of the rise is somewhere else.

Change by division, 2025 actual → 2026 pace

Dollars. MIH and Elected Officials have no 2026 line (see note).

MIH ($897,006 in 2025) moved to a Puget Sound Fire contract recorded in Administration, and Elected Officials is an unbudgeted pass-through. Excluding them makes the like-for-like increase in the other divisions larger, not smaller.

Inside the $6.11M Suppression increase

  1. Positions filled again. 2025 suppression salaries came in $1.75M under budget because of vacancies, but those seats still had to be covered, so the money went to overtime instead. With 2026 closer to full staffing, the cost shifts back into regular wages.
  2. Contract raises that compound. 2.7% for firefighters, engineers and officers in 2026, and 4.0% for support staff. Longevity, education incentive, pension, Medicare, deferred compensation and paid-leave premiums are all calculated on wages, so a 2.7% raise costs more than 2.7%.
  3. Benefits that rise on their own. Medical premiums, a higher deferred-comp match (1.5% → 2.0%), and L&I rates.
  4. Cashouts at retirement or separation. These vary and can’t be controlled within the year.
  5. Dispatch and radio. NORCOM and PSERN went from $1.56M to a $1.63M pace.

A one-time timing effect also landed in 2026: the firefighter contract was ratified late in 2025, so retroactive 2025 pay was paid in 2026.

Prices EF&R doesn’t set

Market costs running above budget

Outside Suppression, the net increase is about $680K, including $889K more for Training academies. These inputs are priced by the market.

Costs outside EF&R’s control

Two lines worth watching

Package 2 looked at two costs set largely by the state: workers’ compensation premiums and wildfire deployment reimbursement.

L&I firefighter rate per hour worked

Statewide class 6904 rate, set by L&I

L&I per employee tripled: $5,338 → $16,205

Three things multiply together: the statewide rate (up 52% from 2023 to 2026, 15% in each of the last three years), EF&R’s experience factor (its claims vs. similar employers over three years), and hours worked. Premium is charged per hour, so every overtime hour carries L&I too. Part of what looks like a claims penalty is the overtime problem showing up a second time.

Transferred workforces don’t explain it on the available data. Woodinville’s claims are already EF&R’s, and only part of Mercer Island’s time falls in the current rating window. The new claims administrator can lower future experience factors but can’t touch the statewide rate. Its full effect won’t show until about 2029.

A budget risk to note: the 2027 estimate ($16,531 per suppression employee) assumes L&I rates rise 2%. If the statewide rate rises 15% again, the line is understated by roughly $500,000.

Wildland overtime vs. cost recovery

Deployment + backfill overtime vs. reimbursement received

Wildfires roughly cover their wages, not their full cost

Deployed crews are reimbursed at EF&R’s own rates, and the people who backfill them at the overtime rate. Over 2023–25, recovery ($2.60M) edged past coded wildland overtime ($2.54M). But the recovery also pays for apparatus and equipment, so that isn’t full cost recovery. Individual years swing: 2024 came in about $347K short.

Three costs stay with EF&R: pension, Medicare, PFML and L&I on backfill hours (overtime is pensionable), finance and shop staff time to claim and restore equipment, and carrying the cost for one to three years until payment arrives. That’s why wildland recovery is budgeted below its $685,987 six-year average.

The deferral boomerang

Cuts in 2025 and 2026 are coming back in 2027

During the 2025–26 adoption, the Board cut staff’s request by $2.11M (2025) and $2.79M (2026), and cut partner contributions by $2.62M and $3.54M. The gap was covered by revenue that came in above forecast, mostly wildland billings and transport fees, and moved around through mid-biennium budget adjustments.

The 2025 staff report warned that excess revenue wasn’t expected to carry the agency through 2027–28. Budgeting overtime at $6.42M, instead of assuming another windfall, is a large part of this year’s increase. The memo says a similar deferral in 2027 “would carry forward into 2029.”

2025: adopted vs amended vs actual

Agencywide operating spending

Actual spending ended $866,665 over the adopted budget. Overtime alone was $2,549,803 over its line, and underspending elsewhere offset much of it.